Speak to an expert: 0114 244 4461
Buy this document for only

£2.99 + VAT

Download example Playarea Installation Method Statement Template

Method statement templates

Playarea Installation (Multi Level) Method Statement

Example Method Statements are written by IOSH and NEBOSH qualified Safety Professionals, delivered instantly to your email address ready for you to download and start editing straight away.

The template should be changed to suit the exact works you are carrying out.

Method Statements are comprehensive, and are about 4-7 pages long, with space for your company details and logo. The lists below are not exhaustive but give you a good indication as to the information included in the Method Statement you are going to purchase.

We include telephone support with all of our documents, call us on the number above for assistance.

  • Preparation
  • Laying of hi-density safety surface and carpet
  • Preparation of steel framework
  • Installation multi-level play area
  • Cleaning inspection and handover